EEEEE (10 Types) 180 pcs Long Lead 5mm LED kit and LED diode Lights Emitting Diode LED Assortment Kit for Tiny Small led and Single led Light led 5mm led Lights led diode Lights diode led
Item Shape:
20 Types 301 Pcs
En stock
0.36 kg
Sí
Nuevo
Amazon
USA
- 🔵 20 types, 301pcs Long Lead LED 🔵 20 individual compartments with lids and labels 🟥 (1,3,5,7,9) 5mm long lead LED Diffused Red Green Yellow Blue Orange 🟥 (2,4,6,8,10,11,12,13) 5mm long lead LED Diffused Red Green Yellow Blue Orange ,Pink, Violet, White 🟥 (14) Red Flash 5mm long lead 2pins Flashing clear red LED on and off 🟥 (15) Red Yellow 5mm long lead 3pins Dual Color (Red/Yellow)Diffused LED with Common Cathode 🟥 (16) Red Green 5mm long lead 3pins Dual Color (RED/GREEN) Diffused LED with Common Cathode 🟥 (17) Green Blue 5mm long lead 3pins Dual Color (Green/Blue)Diffused LED with common Cathode 🟥 (18) RGB Flash 5mm long lead 2pins Slowly Changing Rainbow Colors 🟥 (19) Multi-Color 5mm long lead 4pins, Red Green Blue Multicolor Clear LED with Common Cathode 🟥 (20) WS2812 color bar 5050 SMD LEDs 8 RGB LED are connected thru white PCB. Each LED is individually addressable Built-in WS2812B controller Soldering pins are included
IMPORT EASILY
By purchasing this product you can deduct VAT with your RUT number
Conoce más detalles
⭕️ 20 Types Long lead LEDs, 20 individual compartments with lids and labels 🟢 8 different colors (Pink Violet Red Green Yellow Blue Orange White) with Both Diffused and Clear Options 🔴 Flashing RED LED, DUAL Color LED( RED/YELLOW, RED/GREEEN, GREEN/BLUE) 🔵 Multi color LED (Tri-Color RGB led) 🟣 WS2812 RGB LED BAR (8 leds in a row)